Our Honeywell Delta 1000 Gateway opens up your closed Delta 1000 system and can save up to 90% of the cost of upgrading your Facilities Management System by keeping all your existing field installation untouched! |
|||||
|
The Reason The Reason for replacing your complete Honeywell Delta 1000, 2000, 5100, 5200, 5600 or Excel Building Supervisor (XBS) installationThere could be many reasons for replacing a Honeywell Delta 1000, 5100 or 5600 installation. The Man-Machine Interface of the central system is very old and does not make use of the information collected by the field installation. Spare parts are expensive and hard to find for the central system. If constructing a new building that are to be connected to the central system, would you use old technology from the 1970’s – 80’s? Probably not, and modern day PLC systems (DGP’s) are installed in the new building, which means you cannot connect the new field units to the old, proprietary Honeywell Delta 1000 or 2000 CPU, necessitating an additional central system that runs in parallel with the old Honeywell Delta 1000 system. And there is no transfer of decision making information between the two disparate systems. Is this an optimal solution? We don’t think so. The Problem when replacing a complete Honeywell Delta 1000, Delta 2000, Delta 5100, Delta 5200, Delta 5600 or Excel Building Supervisor (XBS) installationThere are two major problems facing any building owner that plans to replace the complete Honeywell Delta 1000, 2000, 5100, 5200 or 5600 installation and that is Interruption of Building Services and the Equipment Replacement Cost. If you replace all your current Honeywell Delta 2000 DPG’s, 1000 DPG’s, 1200 DPG’s or 1500 DPG’s with new equipment, not only do you have to replace the DGP’s but also all the cabinets, electrical wiring to actuators, sensor wiring and transmission wiring. As the field installation accounts for 88% of the total cost of a complete system, substantial savings are possible if an alternative solution is available. The replacement cost is the one factor that can easily be measured in money. But what about the discomfort imposed on the buildings inhabitants, the danger of missing out on critical alarms during the transition period and not to mention all the errors that are inevitable in any major reconstruction project? Our Solution to the Problem? Decommission only your Delta 1000 CPU and all its peripherals! The Honeywell Delta 1000 Foxtrot 1000 Open Gateway
is a proprietary, special purpose computer designed and built in-house by
Fox Data for the Building Management market. With the Delta 1000
Gateway, you can replace your outdated, central Honeywell Delta
Building Automation Computer System, with today’s state-of-the-art open
SCADA systems. Such new central system not only provides the means
to conserve energy, it does so while retaining all the existing field installation
and thus providing substantial savings, making it a very attractive business
incentive for building owners, and at the same time, providing for environmental
protection by lowering the use of energy. In addition, there are numerous
PLC systems (field systems) available, capable of communicating with a new central system,
making it possible to mix and match brands for any future replacement or
addition of field units. Estimates made by our current customers, shows that huge savings can be made. One customer has a total of 6000 field points. They installed our Honeywell Delta 1000 Foxtrot 1000 Open Gateway and replaced their central Honeywell Delta 1000 CPU and its peripherals with GE Fanuc's FIX, a PC Windows based software solution with a graphical man-machine interface. They had the option of completely replacing all of their building’s existing Honeywell Delta 1000 Building Automation System with 6000 field points at a total cost of approximately $4.5 million. By retaining all the existing field installations and only replacing the central Honeywell Delta 1000 CPU and its peripherals, their savings was in the order of US$4.1 million! Not only did they save a huge amount of money, they now have the means of instigating sophisticated energy conservations algorithms, not to mention the numerous improvements they have made to the management of their buildings. Energy savings made possible Our technology coupled with our extensive knowledge of Energy Conservation in the Building Management area, facilitates environment protection by lowering the use of energy while at the same time making it possible to save huge sums of money. All this and still retaining the comfort level of a building, or, in fact increasing the comfort level through the application of sophisticated computer algorithms and by fully utilizing the buildings sensor installation which simply is not possible using the current Building Automation System. One such example is to employ Electrical Power Reduction by Deterministic Temperature Control. The design team The Foxtrot 1000 Gateway for Delta 1000 is totally transparent
to the user and the host system. Once the 7 wires are connected (power,
Delta 1000 transmission loop and the host serial port), you can simply forget
the Foxtrot 1000 Gateway! Your host system (central SCADA system) believes
that is talking to an ABB COMLI compliant Programmable Logic Controller
(PLC) and all definition of I/O is done in the COMLI driver. There is no
programming to be made, no settings and only 7 wires to be connected and
the system is up and running. All design and setup is done on the new central
system.
For more information about the Foxtrot 1000 Gateway please send us an e-mail to Foxtrot Info
Fox Data AB, P. O. Box 78, 194 22 Upplands
Väsby, Sweden. Telephone +46-8-626 8100. |
|||||